Click on letter for more info
AEM
|
Airborne electromagnetic survey
|
Ag
|
The chemical symbol for silver
|
Alluvial
|
Deposited by the action of running
water in a stream
|
Alteration
|
Changes in the composition of a rock,
generally chemical or mineralogical, brought about by weathering or
hydrothermal activity
|
Arsenopyrite
|
A sulphide mineral of arsenic and iron
(Fe AsS)
|
Assay
|
The chemical test of rock samples to
determine their mineral content
|
Assay
|
To analyze the proportions of metals
in an ore
|
Au
|
Chemical symbol for gold
|
Backfill
|
Waste material used to fill the void
created by mining an ore body with the purpose of providing both regional and
localised support
|
Below Collar
|
A distance below the surface elevation
of a shaft
|
Bench
|
The equivalent of a level in an
underground mine most noticeable as the step-like features in an open-pit
wall. The open-pit bench height is calculated to match the rock
strength, pit economics and capabilities of the open-pit machinery. Typical
bench heights in open-pit mines range from 10 to 20 metres.
|
Best Cut
|
The optimum stoping width for mining of the reef at prevailing metal prices and costs.
|
BIC
|
Bushveld Igneous Complex
|
Birimian
|
Geological Time Era, about 2.1 billion
years ago in which a suite of rocks characteristic to West Africa formed
|
Boudinage
|
A structure common in strongly
deformed sedimentary and metamorphic rock, in which an original continuous
competent layer or bed between less competent layers has been stretched,
thinned and broken at regular intervals into bodies resembling boudius or sausages
|
Breccia/Brecciation
|
Rock type, formed from recrystallised fragments of other rocks
|
Capex
|
Capital expenditure
|
Carat
|
From the Arabic quirrat seed,
unit for measuring the mass of precious stones; it is equal to 0,2g/0,00705 oz, and is part of the troy system of weights.
It is also unit of purity in gold (US karat). Pure gold is 24-carat (the
purest used in jewelry, is 22 parts gold and 2
parts alloy) to give greater strength.
|
Carbon-in-leach
|
A recovery process in which a slurry of gold ore, carbon granules and cyanide are
mixed together. The cyanide dissolves the gold which is absorbed on the
carbon. The carbon is subsequently separated from the slurry for further gold
removal.
|
Carbon-In-Leach (CIL)
|
Similar to the CIP plant except the
gold is leached and absorbed onto carbon granules in the same circuit. The
carbon granules are separated and eluted in the same way as for CIP.
|
Carbon-in-pulp
|
Similar to carbon-in-leach process,
but initially the slurry is subjected to cyanide leaching in separate tanks
followed by carbon-in-pulp. Carbon-in-leach is a simultaneous process.
|
Carbon-In-Pulp (CIP)
|
Gold is leached conventionally from a slurry of gold ore with cyanide in agitated tanks. The
leached slurry passed into the CIP circuit where carbon granules are mixed
with the slurry and gold is absorbed onto the carbon. The granules are
separated from the slurry and treated in an elution circuit to remove to gold
|
Cash Costs
|
Cash costs include site costs for all
mining (excluding deferred development costs), processing and administration,
but are exclusive of royalties, production taxes, amortisation and
rehabilitation, as well as corporate administration, capital and exploration
costs.
|
Channel Width
|
The total thickness of all reef bands
including internal waste.
|
Co
|
Chemical symbol for cobalt
|
Concentrating
|
This is the process of separating
milled ore into a waste stream (tailings) and a valuable mineral stream
(concentrate) by the flotation operation. The valuable minerals in the
concentrate contain almost all the base metal and precious metal minerals;
these minerals are treated further by the smelting and refining process to
obtain the pure metals (Cu, Ni and Platinum Group Metals).
|
Craton
|
A part of the earth's crust that has
attained stability and has been little deformed for a long time
|
Cu
|
Chemical symbol for copper
|
Cut-off grade
|
The lowest grade material that can be
included in a potentially economic intersection without dropping the overall
grade below a specified level, referred to as the minimum mining grade.
Lowest grade of mineralised material that qualifies as ore.
|
Decline
|
A generic term used to describe a
shaft at an inclination below the horizontal and usually at the same angle as
the dip of the reef
|
Development
|
The process of exposing an ore body
through tunneling
|
Development
|
Any tunnelling operation which has for
its object either exploration or exploitation.
|
Development waste
|
All development in country rock.
|
Development-Reef
|
All development on the reef horizon.
|
Diamond drilling
|
A rock drilling method using a rotary
diamond bit which is attached to long hollow rods. The drill cuts a
cylindrical core of solid rock, recovered for geological and metallurgical
examination, and assay purposes
|
Dike
|
A tabular igneous intrusion that cuts
across the planar structures of the surrounding rock
|
Dilution
|
Mixing of ore grade material with
non-ore grade/waste material in the mining process
|
Dip
|
The angle that a structural surface, a
bedding or fault plane, makes with the horizontal, measured perpendicular to
the strike of the structure
|
Drill-core
|
The sample of rock obtained by diamond
drilling
|
Dwt
|
Pennyweight
|
| Electrowinning
|
Chemical process of recovering gold
after elution process
|
Face Advance
|
The average distance the stope face advances per month. A measure of
resource utilisation.
|
Fault
|
A fracture in rock along which there
has been an observable amount of displacement
|
Feasibility study
|
A definitive engineering study addressing
the economic viability of bringing a deposit to the production stage; taking
into consideration all associated costs, revenues and risks. The study is
used to support the search for project financing.
|
Flotation
|
In the flotation process milled ore
mixed with water or pulp is passed through a series of agitated tanks.
Various chemicals are added to the pulp in sequence to render the valuable
minerals hydrophobic (water repellant) and the
non-valuable minerals hydrophilic (water loving). Air is dispersed
throughout the agitated tanks and rises to the surface. The hydrophobic
particles attach to the rising air bubbles and are removed from the main
volume of pulp as a soapy froth. In this manner various combinations of
flotation cells in series are utilised to produce a concentrated stream of
valuable mineral particles called the 'concentrate' and a waste pulp stream
called 'tailings'.
|
Footwall
|
The underlying side of an orebody
|
G/T
|
Grammes per metric tonne gold
|
Geophysical surveys
|
A survey method used primarily in the
mining industry as an exploration tool, applying the methods of physics and
engineering to the earth's surface. Exploration by observation of seismic of
electrical phenomena and the earth's gravitational or magnetic fields, using
specialized instrumentation
|
GIS
|
A geographical information system is a
computerised relational database for spatial information
|
Grade
|
The amount of valuable element in each
ton of ore, expressed as troy ounces per ton for precious metals and as a
percentage for other metals
Cut-off grade is the minimum metal grade at which an
ore body can be economically mined
Millhead grade is the metal content of mined ore going
into a mill for processing
Recovered grade is actual metal content of ore determined
after processing
Reserve grade is estimated metal content of an ore
body, based on reserve calculations
|
Grade also "yield"
|
Gold recovered per unit of rock milled
or treated. Normally measured as grams of gold per ton of rock
|
Grain
|
The smallest unit of mass in the three
English systems (avoirdupois, troy and apothecaries' weights) used in the UK
and USA, equal to 0,0648g. It was reputedly the weight of a grain of wheat.
One pound avoirdupois equals 7 000 grains; one pound troy apothecaries weight
equals 5 760 grains
|
Gram
|
Metric unit of mass; one thousandth of
a kilogram
|
Granite
|
A medium to coarse grained igneous
intrusive rock in which quartz constitutes 10 to 50 percent of the felsic components
|
Granitoid
|
Geological rock type
|
Hanging Wall
|
The overlying side of an orebody
|
Hard-rock gold mining
|
The mining of gold deposits in
bedrock, i.e. deposits other than alluvial, colluvial or eluvial deposits
|
Head Grade
|
The gold contained in material passing
through the mill in grams per tonne or troy ounces per short ton milled
|
Heap leaching
|
A process whereby metals are extracted
by heaping broken ore on an impermeable pad, and repeatedly spraying with
solutions which percolate through the heap, dissolving a high percentage of
the metal content. The resulting mineral solution is then collected for metal
recovery generally by electro-winning
|
Heap/dump leaching
|
A process whereby gold is extracted by
"heaping" broken ore on sloping impermeable pads and repeatedly
spraying the heaps with a weak cyanide solution which dissolves the gold
content. The gold-laden solution is collected for gold recovery
|
Heavy minerals
|
Minerals with high specific gravity
such as ilmenite, zircon, garnets, magnetite and rutile
|
Hedging
|
Generally refers to any precaution
against risk. In the context of gold mines refer specifically to measures to
reduce the risk of gold price fluctuations - particularly a fall in the gold
price. Hedging has almost become standard practice to "insure"
funding over the duration of large capital expenditure programs. Hedging the
gold price is done by forward contracts and options and has developed into
quite an art form.
|
Horizon
|
A plane of stratification assumed to
have been once horizontal and continuous
|
Hydrothermal
|
Process of injection of heated or hot acqucous-rich solutions into existing rocks
|
Igneous
|
Formed by the solidification of hot
mobile material termed magma
|
Indicated Mineral Resource
|
is that part of a Mineral Resource for which
tonnage, densities, shape, physical characteristics, grade and mineral
content can be estimated with a reasonable level of confidence. It is
based on exploration, sampling and testing information gathered through
appropriate techniques from locations such as outcrops, trenches, pits,
workings and drill holes. The locations are too widely or
inappropriately spaced to confirm geological and/or grade continuity but are
spaced closely enough for continuity to be assumed
|
Inferred Mineral Resource
|
is that part of a Mineral Resource for which
tonnage, grade and mineral content can be estimated with a low level of
confidence. It is inferred from geological evidence and assumed but not
verified geological and/or grade continuity. It is based on information
gathered through appropriate techniques from locations such as outcrops, tenches, pits, workings and drill holes that may be
limited or of uncertain quality and reliability
|
In-Situ
|
The original, natural state of the orebody before mining or processing of the ore takes
place
|
Internal Waste
|
Any waste within the reef channel
|
Intrusion
|
The process of emplacement of magma
(naturally occurring molten rock material generated within the earth) in
pre-existing rock
|
IP Survey
|
Induced polarisation survey
|
Kimberlite fissures
|
Kimberlite fissures or dykes are intrusive bodies occurring
along structural weaknesses in rocks. Generally economic diamond-bearing
fissures in South Africa average 600mm to 800mm in width and may well be more
than 5 km in strike length
|
Kriging
|
An interpolation method that minimises
the estimation error in the determination of mineral resources
|
Leaching
|
The dissolving of elements and
minerals out of ore
|
Lenticular
|
Resembling in shape the cross section
of a lens
|
Long-hole stoping
|
A mining method involving drilling of
long holes (up to 30 metres) into the orebody and
then blasting a slice rock into an open chamber. The broken rock is then
extracted leaving the chamber free for the next round of blasting
|
Lower Proterozoic
|
Era or geological time between 2.5 x
109 and 1.8 and 109 years before the present
|
| m
|
Metre
|
MDM
|
Metallurgaical Design and Management
|
Measured Resource
|
That portion of a mineral resource for
which tonnage, densities, shape, physical characteristics, grade and mineral
content can be estimated with a high level of confidence. It is based
on detailed and reliable exploration, sampling and testing information
gathered through workings and drill holes. The locations are spaced
closely enough to confirm geological and/or grade continuity
|
Merensky Reef
|
A band in the Bushveld sequence often containing economic grades of PGM. Merensky Reef is the principal reef mined at Rustenburg Platinum Mines
|
Meta-morphosed
|
The mineralogical and structural
adjustment of solid rocks to physical and chemical conditions which have been
imposed at depth below the surface zones of weathering and cementation
|
Metallurgy
|
The science and art of separating
metals from their ores by mechanical and chemical processes
|
Metasediment
|
A sedimentary rock that has undergone
metamorphism
|
Metavolcanic
|
A rock which was volcanically extruded
onto the surface and subsequently altered mineralogically by a combination of heat and pressure. (Metamorphism)
|
Meta-volcanics
|
Metamorphosed volcanic rocks
|
Mill
|
A plant where ore is ground fine and
undergoes physical or chemical treatment to extract the valuable metals
|
Milling
|
Process to reduce broken ore to a size
where concentrating can be undertaken
|
Mineral
|
A naturally formed chemical element of
compound having a definite chemical composition and, usually, a
characteristic crystal form
|
Mineral Reserve
|
is the economically mineable material derived from a
measured and/or indicated Mineral Resource. It is inclusive of diluting
materials and allows for losses that may occur when the material is
mined. Appropriate assessments, which may include feasibility studies,
have been carried out, including consideration of, and modification by,
realistically assumed mining, metallurgical, economic, marketing, legal,
environmental, social and governmental factors. These assessments
demonstrate at the time of reporting that extraction is justifiable.
Mineral Reserves are subdivided in order of increasing confidence into Probable
Mineral Reserves and Proved Mineral Reserves
|
Mineral Resource
|
is a concentration or occurrence of material of
economic interest in or on the Earth's crust in such form and quantity that
there are reasonable and realistic prospects for eventual economic
extraction. The location, quantity, grade, continuity and other geological
characteristics of a Mineral Resource are known, estimated from specific
geological evidence and knowledge, or interpreted from a well constrained and
portrayed geological model. Mineral resources are subdivided, in order
of increasing confidence in respect of geoscientific evidence, into Inferred, Indicated and Measured categories
|
Mineral Resources
|
Any mineral deposit in such form and
quantity that mining of the mineral may be feasible. The location, grade,
quality and quantity of ore are estimated from specific geological evidence.
Mineral resources are subdivided based upon the confidence of estimated
qualities of that resource
|
Mineral sands
(heavy)
|
Alluvial sand deposits containing a
varied combination of fine-grained heavy minerals
|
Mining Area
|
The area for which a mining
authorisation /permision to mine has been granted
|
Mo
|
Chemical symbol for molybdenum
|
MOZ
|
Million troy ounces
|
MT
|
Million metric tons
|
Ni
|
Chemical symbol for nickel
|
On-reef development
|
Tunnels that are driven on the plane
of The gold bearing reef. The most common form of on-reef development is
"raise lines" that are driven up the dip of the reef
|
Open-pit
|
Open cut; mine worked at surface
|
Ore
|
Rock which contains a mineral or a
concentration of minerals and/or metals which can be mined for a profit
|
Ore reserve
|
That part of a "Resource"
which feasibility studies have shown "could be recovered economically
under conditions realistically assumed at the time of reporting"
|
Orebody
|
Mostly solid and fairly continuous
mass of mineralisation estimated to be economically mineable
|
Overburden
|
Uneconomic material which overlies a
bed of useful material; barren rock
material overlying a mineral deposit
|
Oxidised Ore
|
Ore that has decomposed by exposure to
surface and near-surface elements
|
Oz
|
Ounce
|
Oz/ton
|
Ounce of a particular element per
short ton of rock
|
Pay Limit
|
That grade at which the value of the
ore is equal to the total cost of recovering the precious metal content
|
Pb
|
Chemical symbol for lead
|
PGM
|
Platinum Group Metals, six metallic
elements found in association with each other and constitute the platinoids: Platinum (PI), Palladium (Pd), Rhodium (Rh), Ruthenium (Ru), Osmium
(Os), and Iridium (Ir)
|
Pillar Mining
|
The mining of scattered blocks of reef
of variable size usually associated with older shafts, which have been left
behind and are now being mined in the final clean-up stage of the mine's ore
body
|
Placer
|
A surficial mineral deposit formed by mechanical concentration of mineral particles from
weathered debris
|
Pluton
|
An igneous intrusion
|
Ppm
|
Parts of a particular element per
million parts of rock or soil
|
Pre-feasibility study
|
The initial stage of the feasibility
study in which the accuracy of the factors involved such as costs and revenues is +- 25%. Should the pre-feasibility study be
positive, then the company would move to the final feasibility study
|
Probable Mineral Reserve
|
is the economically mineable material derived from a
Measured and/or Indicated Mineral Resource. It is estimated with a
lower level of confidence than a Proved Mineral Reserve. It is
inclusive of diluting materials and allows for losses that may occur when the
material is mined. Apppropriate assessments,
which may include feasibility studies, have been carried out, including
consideration of and modification by, realistically assumed mining,
metallurgical, economic, marketing, legal environmental, social and
governmental factors. These assessments demonstrate at the time of
reporting that extraction could reasonably be justified.
|
Probable Ore Reserve
|
The economically mineable part of an
Indicated, and in some circumstances, Measured Mineral Resource, it includes
diluting materials and allowances for losses which may occur when the
material is mined. Appropriate assessments, which may include
feasibility studies, have been carried out and include consideration of and
modification by realistically assumed, mining, metallurgica,
economic, marketing, legal, environmental, social and governmental
factors. These assessments demonstrate at the time of reporting that
extraction could reasonably be justified
|
Proved Mineral Reserve
|
is the economically mineable material derived from a
Measured Mineral Resource. It is estimated with a high level of
confidence. It is inclusive of diluting materials and allows for losses
that may occur when the material is mined. Appropriate assessments,
which may include feasibility studies, have been carried out, including
consideration of and modification by realistically assumed mining,
metallurgical, economic, marketing, legal, environmental, social and
governmental factors. These assessments demonstrate at the time of reporting
that extraction is reasonably justified.
|
Proven Ore Reserve
|
The economically mineable part of a
Measured Mineral Resource. It includes diluting material and allowances
for losses which may occur when the material is mined. Appropriate assessments,
which may include feasibility studies, have been carried out and include
consideration of and modification by realistically assumed, mining,
metallurgical, economic, marketing, legal, environmental, social and
governmental factors. These assessments demonstrate at the time of
reporting that extraction could reasonably be justified
|
Productivity
|
An expression of labour productivity
based either upon the ratio of grams of gold produced to the total number of
employees or the area mined in square metres to the total number of employees
|
Quartz
|
Crystalline silica; silicon dioxide
|
Quartzite
|
A very hard, often metamorphosed,
sandstone consisting chiefly of tightly cemented quartz grains
|
Quartzitic
|
Contining beds of quartzite, a sedimentary or metamorphic
rock composed almost entirely of quartz grains
|
RC
|
Reverse circulation drilling
|
Reclamation
|
The process by which lands disturbed
as a result of mining activity are reclaimed back to a beneficial land use.
Reclamation activity includes the removal of buildings, equipment, machinery
and other physical remnants of mining, closure of tailings impoundments,
leach pads and other mine features, and contouring, covering and revegetation of waste rock piles and other disturbed
areas
|
Recovery Rate
|
A term used in process metallurgy to
indicate the proportion of valuable material obtained in the processing of an
ore. It is generally stated as a percentage of the material recovered
compared with the total material present
|
Reef
|
A gold-bearing quartz vein
|
Reef
|
Ore of economic interest
|
Refining
|
The final stage of metal production in
which impurities are removed from the molten metal
|
Regolith
|
Fragmental and unconsolidated rock
material overlying bedrock
|
Resource definitions
|
The mineral resources and mineral
reserves of the Group are classified, verified and reported in accordance
with statutory, stock exchange and industry/professional guidelines.
The classifications are based on the SAMREC Code.
|
Reverse circulation drilling (RC)
|
A drilling method using a tricone bit, during which rock cuttings are pushed to the
surface through an outer tube by liquid and/or air pressure moving through an
inner tube
|
Reverse fault
|
A thrust fault with a dip of 45"
or less in which the hanging wall appears to have moved upward relative to
the footwall
|
ROM
|
Run of Mine - equivalent to normal
feed ore from mining operations
|
RP
|
Reconnaise permit
|
Sandstone
|
A medium-grained sedimentary rock
composed of abundant fragments of sand size set in a fine-grained matrix of
silt or clay
|
Saprolite
|
Weathered rock with distinguishable
features/minerals of original rock
|
Schist
|
A strongly foliated crystalline rock
formed by dynamic metamorphism
|
Sedimentary
|
Sourced from erosion of other rock
|
Shale
|
A fine-grained detrital sedimentary rock formed by the consolidation of clay, silt or mud and
characterized by finely stratified structure
|
Shear zone
|
A tabular zone of rock that has been
crushed and brecciated by many parallel fractures
due to shear strain
|
Shrinkage mining:
|
A mining method often used when mining
narrow orebodies, whereby a series of short holes
are drilled into the face of the orebody. The rock
is then blasted and remains until the entire zone is mined at which time the
broken rock is extracted
|
Sintering
|
To form large particles, or lumps, or
masses from, inter alia, metal powders by heating or pressure or both
|
Smelting
|
A metallurgical operation in which
metal is separated from impurities by a process that includes fusion
|
Spot gold price
|
Refers to the open market gold price
that we all hear on the radio or see in the morning paper. A spot price is
the opposite of a contractual or fixed price, which remains constant over a
certain agreed period
|
Sterilisation
|
Drilling carried out to ensure there
is no hidden mineralisation below of permanent infrastrucutre (also known as condemnation drilling)
|
Stope
|
An area in an underground mine where
ore is mined
|
Stopes
|
Underground excavations where the ore
body is extracted on the plane of the reef
|
Stoping
|
The process of mining the ore body on
the plane of the reef
|
Stoping Width
|
The sum of the channel width and
external waste widths
|
Strike
|
The direction or trend that a
structural surface, e.g. a bedding or fault plane, takes as it intersects the
horizontal
|
Stringer
|
A mineral veinlet (typically less than 1cm wide), or filament occurring in a discontinuous
pattern in the host rock
|
Stripping Ratio
|
The number of units of unpayable material which is to be mined in order to
expose one unit of ore
|
Sulphide
|
A compound of sulphur with metallic
element
|
Sweepings
|
The final process in stoping operations where the footwall is thoroughly
cleaned to remove the last portion of broken ore and fines
|
Syncline
|
A concave upward fold, the core of
which contains the stratigraphically younger rocks
|
T (t)
|
Tonne
|
Tailings
|
Finely ground rock material that
remains once all economically-valuable metals are removed
|
Tailings
|
Ultra-fine particles of low residual
value which are discarded by the metallurgical process
|
Tailings
|
The material that remains after all
metals considered economic have been removed from ore during milling
|
Tailings Grade
|
The 4E content of the tailings
produced by the milling and concentrating process - when compared to head
grade is a measure of the efficiency of the concentrating process
|
Termitary
|
Geochemical sampling of residual surficial material (mounds) produced by termites
|
Ton
|
(Used in imperial statistics)
A short tone equal to 2 000 pounds
|
Tonne
|
(Used in metric statistics)
Equal to 1 000 kilograms
|
Tourmaline
|
A mineral commonly found as an
accessory in intermediate to felsic igneous rocks,
metamorphic rocks and certain sedimentary rocks
|
TPM
|
Metric tonnes per month
|
Tramming Width
|
A dimension used to denote the effect
of waste tons in the stoping operation, such as
from gullies, on the reef tons produced. It is the sum of the channel width
plus the impact of waste tonnage in the stoping operation, e.g. from gullies and extraneous falls of ground, expressed in
centimetres
|
Transport
|
The moving of broken rock to the shaft
and the transport of men and materials to the working faces
|
Trend
|
The regional strike of a geological
feature
|
Troy ounce
|
(Used in imperial statistics)
Equal to 31 10348 grams
|
Troy system
|
A system of units used for precious
metals and gems. The pound troy (0.37kg) consists of 12 ounces (each of 120
carats) or 5 760 grains (each equal to 65 mg)
|
U
|
Chemical symbol for uranium
|
UG 2 Reef
|
A chromite layer within the critical zone of the Bushveld Igneous Complex
|
Unit working costs or gold production costs
|
Average working costs per unit of
output, also referred to as gold production costs. In the case of gold mines
this is usually expressed as rand per kilogram of gold. Other measures are
rand per ounce and dollar per ounce
|
Unoxidised Ore
|
Ore that has not undergone
changes/degradation due to the weathering process close to surface
|
Vein
|
A thin sheetlike crosscutting body of hydrothermal mineralization, principally quartz
|
Weathering
|
The destructive process constituting
that part of erosion whereby earthy and rocky materials on exposure to
atmospheric agents at or near the earth's surface are changed in character
with little or no transport of the loosened or altered material
|
Whittle 4D
|
An optimisation computer program used
for open pit mine design
|
Wireframe
|
Outline of an orebody based on varying parameters
|
Yield
|
The amount of valuable mineral in the
ore expressed as grams per tonne or troy ounces per short ton
|
Zn
|
Chemical symbol for zinc
|
|
Conversion Charts
| To Convert |
Multiply by |
Inches to Centimetres
Centimetres to Inches
Inches to Metres
Inches to Millimetres
Feet to Metres
Metres to Feet
Metres to Inches
Yards to Metres
Metres to Yards
Miles to Kilometres
Kilometres to Miles
Sq Ins to Sq Centimetres
Sq Centimetres to Sq Ins
Sq Metres to Sq Feet
Sq Feet to Sq Metres
Sq Yards to Sq Metres
Sq Metres to Sq Yards
Sq Miles to Sq Kilometres
Sq Kilometres to Sq Miles
Acres to Hectares
Hectares to Acres
Cu Ins to Cu Centimetres
Cu Centimetres to Cu Ins
Cu Feet to Cu Metres
Cu Metres to Cu Feet
Cu Yards to Cu Metres
Cu Metres to Cu Yards
Cu Inches to Litres
|
2.5400
0.3937
0.0254
25.4
0.3048
3.2808
39.3701
0.9144
1.0936
1.6090
0.6214
6.4520
0.1550
10.7600
0.0929
0.8361
1.1960
2.5900
0.3861
0.4047
2.4710
16.3900
0.0610
0.0283
35.3147
0.7646
1.30795
0.0163 |
| To Convert |
Multiply by |
Litres to Cu Inches
Gallons to Litres
Litres to Gallon
Grains to Grams
Grams to Grains
Avoirdupois Ounces to Grams
Grams to Avoirdupois Ounces
Troy Ounces to Grams
Grams to Troy Ounces
Pounds to Grams
Grams to Pounds
Pounds to Kilograms
Kilograms to Pounds
Tons to Kilograms
Kilograms to Tons
Short ton to Kilograms
Metric ton to Kilograms
Grammes/1000 Kilos to Troy Ounces/1000 Kilos
Troy Ounces/Short Ton to Grams/1000 Kilos (oz/t to gAu/t)
Ounces/Long Ton to Grams/1000 Kilos
Ounces/Long Ton to Ounces/1000 Kilos
Grammes/1000 Kilos to Ounces/Long Ton
Grammes/1000 Kilos to Ounces/Short Ton
|
61.0300
4.5460
0.2200
0.0648
15.4300
28.3500
0.0352
31.1035
0.03215
453.6000
0.0022
0.4536
2.2046
1016.047
0.0009
907.185
1000.000
0.0321507
34.28573
30.6122
0.984206
0.032667
0.029167
|
|
|